This is the new substructure. Clockwise from the top left: an overview - the hot-tub area is now level with the main deck, detail showing the extensive underpinning of the main joists which will be supporting the hot-tub. The joists are all plated. The bottom two photographs show the upper joists being replaced with the old deck boards. The entire upper portion was also straightened orthoganally.
Blue Dog Construction and renovation specializing in construction projects which include remodelling and new building as well as renovations from the foundations to the roof and from residential to commercial projects