blue Dog Construction


 


 
















  
  
The basement prior to construction showing the existing sunroom and above right, the existing - almost non-existant foundations
























   Forming the foundations - the East wall was 34" high. The small step down at the centre is for the patio door openings
























  The rain destroyed the trenches which had to be cleaned out by hand before the pour. On the right, trowelling the concrete

  Take me back

Take me to the next pictures

Take me home