blue Dog Construction


 


 
















  

                     The slab's rebar shown tied and sitting on the 2" dobis on a layer of sand. On the right, the pour.
































  The pour showing us filling the new footing between the original structure and the new addition


  Take me back

Take me to the next pictures

Take me home